Urusan Pemerintahan | : | 1.11 Lingkungan Hidup |
---|---|---|
Organisasi | : | 11101000 DINAS LINGKUNGAN HIDUP |
Program | : | 1.11.03 Program Peningkatan dan Pengelolaan Kantor Urusan Lingkungan Hidup |
Kegiatan | : | 1.11.03.002 Pengadaan Perlengkapan Pendukung Command Center Lingkungan Hidup |
Pagu Kegiatan | : | Rp. 226,715,714 |
Komponen |
Satuan |
Koefisien |
Harga |
PPN |
Total |
|
---|---|---|---|---|---|---|
[BELANJA BARANG DAN JASA] 5.2.2.01.03 Belanja Alat Listrik dan Elektronik (Lampu Pijar, Battery Kering) | ||||||
Baterai | Dus | 2 dus | 396,000 | 79,200 | 871,200 | |
Spesifikasi : Bahan Dan Uk.Standar U. A2
|
||||||
Total Belanja Alat Listrik dan Elektronik (Lampu Pijar, Battery Kering) : | 871,200 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.01.13 Belanja Alat Tulis Kantor Sarana Teknologi Informasi | ||||||
Keyboard | Unit | 5 Unit | 259,120 | 129,560 | 1,425,160 | |
Spesifikasi : Full Size Keys, Adjustable Legs
|
||||||
Mouse Optical Wireless | Pcs | 5 Unit | 198,000 | 99,000 | 1,089,000 | |
Spesifikasi :
|
||||||
Total Belanja Alat Tulis Kantor Sarana Teknologi Informasi : | 2,514,160 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.01.14 Belanja Perkakas Kerja | ||||||
Audio Sound System | Set | 1 set | 48,000,000 | 4,800,000 | 52,800,000 | |
Spesifikasi : Speaker System; Audio Amplifier, Subwoofer, Loudspeakers
|
||||||
Vacum Cleaner (Wet and Dry Vacuum Cleaner) | unit | 1 Unit | 6,376,940 | 637,694 | 7,014,634 | |
Spesifikasi :
|
||||||
Total Belanja Perkakas Kerja : | 59,814,634 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.01.16 Belanja Dokumentasi, Dekorasi dan Publikasi | ||||||
Banner | Meter | 10 M2 | 41,480 | 41,480 | 456,280 | |
Spesifikasi : Bahan Dan Ukuran Standar
|
||||||
Total Belanja Dokumentasi, Dekorasi dan Publikasi : | 456,280 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.01.38 Belanja Barang Pakai Habis Teknologi Informasi Komunikasi | ||||||
Connector Vga, Video, Power High Quality | Set | 2 Unit | 3,556,570 | 711,314 | 7,824,454 | |
Spesifikasi :
|
||||||
Harddisk Eksternal | Unit | 2 Unit | 2,063,430 | 412,686 | 4,539,546 | |
Spesifikasi : Hdd 2Tb
|
||||||
Total Belanja Barang Pakai Habis Teknologi Informasi Komunikasi : | 12,364,000 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.20.14.002 Belanja Pemeliharaan Komputer/PC | ||||||
Perbaikan Power Supply | Unit | 2 Unit | 1,036,900 | 207,380 | 2,281,180 | |
Spesifikasi :
|
||||||
Total Belanja Pemeliharaan Komputer/PC : | 2,281,180 | |||||
[BELANJA BARANG DAN JASA] 5.2.2.20.26.001 Belanja Pemeliharaan Gedung Kantor | ||||||
Ups | Buah | 2 Unit | 3,600,000 | 720,000 | 7,920,000 | |
Spesifikasi : 630 Watt
|
||||||
Total Belanja Pemeliharaan Gedung Kantor : | 7,920,000 | |||||
[BELANJA MODAL] 5.2.3.12.02 Belanja Modal Pengadaan Komputer/PC | ||||||
Komputer Pc | Unit | 2 Unit | 18,720,000 | 3,744,000 | 41,184,000 | |
Spesifikasi : Intel Core I7-4770, Memory 8 Gb Ddr3, 1 Tb Hdd Sata, Dvd+/-Rw, Vga Nvidia Geforce Gt X650 1Gb, Audio, Gbe Nic, Os Windows 8.1 64Bit Sl, Garansi Internasional 2 Tahun
|
||||||
Total Belanja Modal Pengadaan Komputer/PC : | 41,184,000 | |||||
[BELANJA MODAL] 5.2.3.12.03 Belanja Modal Pengadaan Komputer Note Book/Laptop | ||||||
Laptop | Unit | 1 Unit | 22,894,750 | 2,289,475 | 25,184,225 | |
Spesifikasi : Intel Core I7-3687U, Memory 8Gb Ddr3, 256 Gb Ssd, Gbe Nic, Wifi, Bluetooth, Fingerprint, Vga Intel Hd Graphics 4000, Camera, 14" Wxga, Win7 Pro 64Bit, Garansi 3 Tahun
|
||||||
Total Belanja Modal Pengadaan Komputer Note Book/Laptop : | 25,184,225 | |||||
[BELANJA MODAL] 5.2.3.12.04 Belanja Modal Pengadaan Printer | ||||||
Printer | Unit | 2 Unit | 3,005,970 | 601,194 | 6,613,134 | |
Spesifikasi : Laserjet
|
||||||
Total Belanja Modal Pengadaan Printer : | 6,613,134 | |||||
[BELANJA MODAL] 5.2.3.12.10 Belanja Modal Pengadaan Peralatan Jaringan Komputer | ||||||
Bingkai Sedang | Buah | 8 Buah | 223,240 | 178,592 | 1,964,512 | |
Spesifikasi :
|
||||||
Router | unit | 1 Unit | 40,000,000 | 4,000,000 | 44,000,000 | |
Spesifikasi : 24 10/100/1000BASE-T auto-sensing Gigabit Ethernet switching ports
|
||||||
Switch Hub 24 Port | pcs | 2 Unit | 4,259,000 | 851,800 | 9,369,800 | |
Spesifikasi : 24 x Gigabit Ethernet Port, 2 x SFP Port, 802.1Q VLAN for traffic segregation, Port-based VLAN, Switch Managed
|
||||||
Total Belanja Modal Pengadaan Peralatan Jaringan Komputer : | 55,334,312 | |||||
[BELANJA MODAL] 5.2.3.13.01 Belanja Modal Pengadaan Meja Kerja | ||||||
Meja Komputer | Buah | 2 Buah | 2,920,520 | 584,104 | 6,425,144 | |
Spesifikasi :
|
||||||
Total Belanja Modal Pengadaan Meja Kerja : | 6,425,144 | |||||
[BELANJA MODAL] 5.2.3.17.16 Belanja Modal Pengadaan Jaringan Teknologi Informasi | ||||||
Kabel Hdmi | Unit | 5 Buah | 336,990 | 168,495 | 1,853,445 | |
Spesifikasi :
|
||||||
Total Belanja Modal Pengadaan Jaringan Teknologi Informasi : | 1,853,445 | |||||
::: Total : | 222,815,714 | |||||
:: Total : | 222,815,714 | |||||
:: Pelaporan | ||||||
[BELANJA BARANG DAN JASA] 5.2.2.11.02 Belanja Makanan dan Minuman Rapat | ||||||
Makan Rapat/Bimbingan Teknis/dan atau Kegiatan Sejenis | Orang/kali | 30 Orang Kali | 47,000 | 0 | 1,410,000 | |
Spesifikasi :
|
||||||
snack Rapat/Bimbingan Teknis /dan atau kegiatan sejenisnya | orang/kali | 30 Orang Kali | 18,000 | 0 | 540,000 | |
Spesifikasi :
|
||||||
Total Belanja Makanan dan Minuman Rapat : | 1,950,000 | |||||
::: Total : | 1,950,000 | |||||
:: Total Pelaporan : | 1,950,000 | |||||
:: Persiapan | ||||||
[BELANJA BARANG DAN JASA] 5.2.2.11.02 Belanja Makanan dan Minuman Rapat | ||||||
Makan Rapat/Bimbingan Teknis/dan atau Kegiatan Sejenis | Orang/kali | 30 Orang Kali | 47,000 | 0 | 1,410,000 | |
Spesifikasi :
|
||||||
snack Rapat/Bimbingan Teknis /dan atau kegiatan sejenisnya | orang/kali | 30 Orang Kali | 18,000 | 0 | 540,000 | |
Spesifikasi :
|
||||||
Total Belanja Makanan dan Minuman Rapat : | 1,950,000 | |||||
::: Total : | 1,950,000 | |||||
:: Total Persiapan : | 1,950,000 | |||||
Grand Total : | Rp. 226,715,714 |
2013 © Pemerintah Provinsi DKI Jakarta.